Factory wholesale Concrete Pump Tube - Delivery Pipe – ANCHOR
Factory wholesale Concrete Pump Tube - Delivery Pipe – ANCHOR Detail:
|
Part number |
Type |
Thickness (mm) |
Length (mm) |
Weld-on ends |
Applicable pump |
Brands material |
|
SJT-1 |
DN125 (5″) |
4.0 |
3000 2000 1000 |
SK-148mm |
Schwing, Putzmeister CIFA Kyokuto Sany Zoomlion |
ST52 ST37 20# Q235 |
|
SJT-2 |
DN125 (5″) |
4.5 |
SK-148mm |
Schwing, Putzmeister CIFA Kyokuto Sany Zoomlion |
||
|
SJT-3 |
DN125 (5″) |
7.1 |
SK-148mm |
Schwing, Putzmeister CIFA Kyokuto Sany Zoomlion |
||
|
SJT-4 |
DN125 (5″) |
4.0 |
Schwing F/M |
Schwing |
||
|
SJT-5 |
DN125 (5″) |
4.5 |
Schwing F/M |
Schwing |
||
|
SJT-6 |
DN125 (5″) |
7.1 |
Schwing F/M |
Schwing |
||
|
SJT-7 |
DN125 (5″) |
7.1 |
ZX-F/M |
Putzmeister |
||
|
SJT-8 |
DN100 (4″) |
4.0 |
122mm/ 127mm |
Schwing, Putzmeister CIFA Kyokuto Sany Zoomlion |
||
|
SJT-9 |
DN100 (4″) |
4.5 |
122mm/ 127mm |
Schwing, Putzmeister CIFA Kyokuto Sany Zoomlion |
||
|
SJT-10 |
DN100 (4″) |
6.0 |
122mm/ 127mm |
Schwing, Putzmeister CIFA Kyokuto Sany Zoomlion |
||
|
SJT-11 |
DN80 (3″) |
4.0 |
98mm |
Schwing, Putzmeister CIFA Kyokuto Sany Zoomlion |
||
|
SJT-12 |
DN80 (3″) |
4.5 |
98mm |
Schwing, Putzmeister CIFA Kyokuto |
||
|
SJT-13 |
DN150 (6″) |
8.0 |
ZX-F/M |
Putzmeister |
||
|
SJT-14 |
DN150 (6″) |
8.0 |
3000 2000 1000 |
6HD |
Schwing, Putzmeister CIFA |
|
|
SJT-15 |
DN125 (5.5″) |
4.5 |
5HD |
Schwing, Putzmeister CIFA |
||
|
SJT-16 |
DN100 (4″) |
4.0 |
4HD |
Schwing, Putzmeister CIFA |
||
|
SJT-17 |
DN80 (3″) |
4.0 |
3HD |
Schwing, Putzmeister CIFA |
||
|
SJT-18 |
DN125 (5.5″) |
6.5 |
Sany- 157mm |
Sany |
||
|
SJT-19 |
DN125 (5.5″) |
6.5 |
ZoomlionF/ M-175mm |
Zoomlion |
||
|
SJT-20 |
We can also produce the special concrete pump delivery pipes, 2″-8″,length 500mm-6000mm,thickness:3mm-15mm, or according to the customer’s specific requirements. |
|||||
The product is made of the special material steel tubes,after quenching inside it.Carburizing chemical treatmeat,Flange sleeving,Its hardness reaches 58-62 degrees.The life of pipeline increases 3-5 time.So that can make users save time,Coat and the trouble of changing tubes and improve production efficiency.
SRUCTURE
|
Name |
Structure |
HRC |
Thickness mm |
Structure Sketch Map |
|
Base Material |
Pearlite & Ferrite |
23 |
2.5 |
Abrasionresist layer/ Crackresist layer |
Life Comparison & Quality
|
Name |
Material |
Structure |
Characteristic |
Life (squre) |
life (squre) |
|
Normal |
20 |
Monolayer |
Low cost,rapid abrasion,short life |
7000-8000 |
|
|
High Quality |
Alloysteel |
Monolayer |
High cost,long life |
20000-25000 |
|
|
Hardening (doublelayer) |
Alloysteel |
Double |
Higher cost with abrasion resist wall and crack resist ektexine.4-5 times longer life |
38000-45000 |
Product detail pictures:
Related Product Guide:
We can always satisfy our respected customers with our good quality, good price and good service due to we are more professional and more hard-working and do it in cost-effective way for Factory wholesale Concrete Pump Tube - Delivery Pipe – ANCHOR , The product will supply to all over the world, such as: Marseille , Salt Lake City , Lahore , our qualify products have good reputation from the world as its most competive price and our most advantage of after-sale service to the clients.we hope we can provide a safe, environmental products and super service to our clients from all of the world and establish strategic partnership with them by our professional standards and unremitting efforts.
By Agatha
from Rwanda
- 2018.06.28 19:27
Reasonable price, good attitude of consultation, finally we achieve a win-win situation,a happy cooperation!
By Phoenix
from Oman
- 2018.10.01 14:14












